Development site at Millbank Complex, 25 Millbank
Scheme approved. Refurbishment and replacement of facades and erection of two additional floors and plant enclosure to both Millbank Tower and one additional floor to the Y buildings; excavation of basement levels; demolition of rear car park in association with re-landscaping and reconfiguration of wider site; all in association with the use of the Tower as 207 private residential flats (Class C3) and Skybar (ancillary to adjacent Class C1), the south podium and part of Tower as an arts/ cultural facility (Class D1) and the north podium and Y buildings as a 150 bedroom hotel (Class C1) with restaurant, bar and cafe at ground floor level. Use of roof of podium building as a terrace with associated alterations. [EIA Development]