Site of Former Cyclotron Building And Land Adjacent, Hammersmith Hospital, Du Cane Road, Land at Linford Christie Stadium, Artillery Way, Du Cane Road, Land at Burlington Danes Academy, Wood Lane

Scheme approved. Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.